Production facilities and assets
Our capacity

Production facilities and assets

In-house production facilities, asphalt plants, concrete batching plants, and a quarry ensure complete independence from suppliers.

In-house facilities

Production independence and quality control

Full in-house capacity lets us manage quality and schedules at every stage of construction.

In-house production facilities mark a new stage in the company’s development. As part of its strategy to improve service quality and expand production capabilities, ABS-Limited LLP has set up modern facilities and equipment that ensure full quality control and guaranteed on-time delivery.

In-house production

Activated mineral powder plant

2026 Full cycle

The activated mineral powder plant was put into operation in May 2026 in the Kulsary industrial zone. Mineral powder is an essential ingredient in asphalt mix production, and in-house production makes the company fully self-sufficient in materials.

The production line includes raw material feed hoppers, a drying drum, a grinding and separation unit with a dust extraction system, and finished product storage silos with shipment in big bags. The plant makes a high-quality product both for the company’s own projects and for third-party customers.

The key value of in-house production assets is full quality control at every stage of production and independence from suppliers, which guarantees that work is completed on schedule.

Location: Kulsary industrial zone
Asset type: Plant
Inquire about products
Our capacity

Production assets

Plants, processing units, a quarry, and equipment that support full-cycle works.

Production facility in Atyrau Production facility 2016

Production facility in Atyrau

In 2016, ABS-Limited LLP completed construction of its own modern production facility in Atyrau and put it into operation.

Location: Atyrau
Capacity: Modern facilities and equipment
Production facility at Tengiz camp Production facility 2019

Production facility at Tengiz camp

A 2-ha land plot was acquired. In November 2019, the facility was put into operation with a dormitory and office for 100 people, a 400 m² garage hangar, and an asphalt plant.

Location: Tengiz camp
Capacity: 2-ha site
Asphalt plants Asphalt plant 2015–2016

Asphalt plants

In 2015, the company acquired a 60 t/h asphalt plant, followed in January 2016 by a modern 100 t/h plant. The result: a 1.7-fold increase in capacity, simultaneous production of different mix types, full compliance with GOST and international standards, and automated quality control.

Location: Kulsary
Capacity: 60 and 100 t/h
RD 175 asphalt plant Asphalt plant

RD 175 asphalt plant

Quick-install stationary plant. 2,200 kg mixer (2 × 37 kW), Ø2,200 mm drying drum (4 × 18.5 kW), 110 kW exhaust fan, baghouse filters and cyclones, and a load-cell weighing system. Installed electrical power: 455 kW. Energy-efficient and ready for major road projects.

Capacity: 175 t/h
Bitumen emulsion plant Processing plant 2024

Bitumen emulsion plant

Acquired in July 2024. Produces modern road materials for major road repairs. Full quality control and independence from suppliers.

Location: Building 66, Birlik, near the TV tower, Atyrau
Capacity: 10 t/h
Concrete batching plants Concrete batching plant

Concrete batching plants

Two concrete batching plants with a combined output of 160 m³/h, located at the production facility at Building 66, Birlik, near the TV tower, Atyrau.

Location: Birlik, Atyrau
Capacity: 160 m³/h (2 plants)
Mixer truck fleet Concrete delivery fleet 2025

Mixer truck fleet

Concrete mixer trucks deliver ready-mix concrete to construction sites, preserve the quality of the mix, and keep supply uninterrupted between production facilities and job sites.

Capacity: Uninterrupted supply
Sand and gravel quarry Quarry

Sand and gravel quarry

Company-owned sand and gravel quarry right next to Kenbai railway station, with its own railway siding and reserves of 40 million m³. It ensures a steady supply of aggregates.

Location: Kenbai station, Kyzylkoga District
Capacity: 40 million m³ of reserves
Production in numbers

Key capacity figures

Our own plants and processing units meet the needs of major road and industrial projects in the region.

0 t/h
RD 175 asphalt plant
0 m³/h
Concrete batching plant
0 million m³
Sand and gravel quarry reserves
0 m³
Turnkey tanks

Ready to discuss your project?

Entrust your construction project to professionals. We will prepare a cost estimate, propose the optimal solution, and guarantee on-time delivery and compliance with quality standards.